Now not to leave on a negative note...The roof demolition is coming right along with a lot more light in the loft once that section of roofing was removed. Worried me a little at first, but all is well so far. Bits and pieces of rotted wood on the parapet, and tons of glue etc. all over to try to stop the leaks. All the stuff that I want done right this time.
In the bathroom you can see all the dust floating in the air as they cut out the last of the structures. They are now working on getting rid of the tile floor and the sub floor. I have to hand it to these crews, they are all being super careful and cleaning up as they go along.
The parking down here is at a premium, so there is a lot of too and froing which is complicated right now by the phone man. That has turned into a strange odyssey of it's own. We are finding all sorts of problems with the wiring and electrical system and now the phone lines as well. Hopefully it will all get sorted out and done the right way.
Ah, Day 3!