Tuesday, August 23, 2011

Day 22...The Dance Floor and New Plumbing!

Mat and Andres cleaned up the new Dance Floor, leaving just the old tile. The tile will be used in the hall. Amazingly, after all the messes we have found with the wiring and water lines, somehow the previous owners managed to pour a really nice slab! The question is what to do with it. It really opens up the yard, and would be an ideal place to practice tai chi...plants are begging for space here and in the winter it will absorb a lot of heat from the sun. At this time of year, I can see that I might have to plant some fast growing trees on the west end. But since this wasn't part of the original project, it can wait will I ponder.
Once the electrician gets done here, it will be sheet rocked and a fully functional closet instead of the mess it was before with pipes, hoses, wires and insulation all over the place. Very neat job...just one little problem and hopefully that will be sorted out this am. In all the focus on the bathroom, somehow, while the water was off, the lines to the kitchen were capped off. Crazy but true, and I didn't notice until everyone was gone. Called for a glass of wine and a massage, that did, but it worked and my sense of humor remains intact!

The Shower starts to take shape with the installation of the water valve...I call it the thermonuclear option...will control water temps and once it is set all I have to do is choose the rain head in the ceiling, or the handheld wand.

1 comment:

  1. I’m glad to see that there was a slab under that built up floor! I know there was some concern all around. Lots of potential uses!

    ReplyDelete