Monday, January 16, 2012

 I came home from Nevada City to find the plastic back up so that the priming of the parts of the shed and deck could start...hopefully we will get the paint on before the predicted rain comes on Thursday.
 There was a also a box just sitting around with the wheels for the sliding panels high up above.
 Work progresses on the opening but the metal is welded into place.  Am not sure why no one came to continue the work on that part of the job.
 Since the rain is predicted, and I have so much bare bare ground, we put in two orders for chips from Kville Lumber...very nice chips and for once I didn't have to spread them all around...I think tomorrow we will have to make them thicker under the deck.

 JR is new to this job, and KOKO has decided that she should bark at him and charge him at each chance.  I caught her in the act this evening.  He is being a good sport about it, but she is really being a pain.  She ended up barking at just about everyone late this afternoon.  I think having the plastic back up, and so much commotion has gotten to her today...hope she sleeps well!
The chips are spread under the deck, and almost all the surfaces that need priming are done, or close to it.  Tomorrow the dark brown paint goes on I hope, and then we can get back to metaling.  I want to see those big walls metaled soon!  I know we need rain in the worst way, but am hoping that the work doesn't get to derailed!

No comments:

Post a Comment