Thursday, January 26, 2012

1-26-12 Bridge, Awning, Gravel and Siding

 Moving right along this morning on the steps down to the back of the house, Dennis and RJ consult in the heavy mist.
 While George waited for the metal for the awnings, he was able to weld this post in under the bridge.
 The last piece of the awning...dang, it won't go on until tomorrow...but it all looks very cool.
 George welding on the last awning over the door to the dining room.
 Danny and Jose finally get to start back on the corrugated metal...a superb job as usual.  At least this time they won't have to be so high up with super long sheets!
 Greg delivered the trailer/dumpster out to the end of Dam Road.  This provoked a few calls wondering if it had been stolen and left beside the road...Thanks for the look out Pierre!  After I saw the effects of the first run, I told the guys to just go ahead and use it all up.  My neighbors have been so patient during all this long long process.  I know I will have to do more when we are all done or when more rain comes, but this should help out right now.
 Hopefully this will make the surrounding driveways less muddy!
 The welder and George are really outside the dining room...good thing we had some plywood for him to get that far out.  They had to take some off the front deck to extent out to where George was working.
And a shot of the finished awnings outside the dining room.  I can't wait until the lighting goes in...I think it will be really neat and shouldn't affect my star gazing!

No comments:

Post a Comment